My cite has been the same type of flow since I have started. The only main change that took place was the plumbing issue that was going on for about two weeks, because of an outside piping problem. We had to close the center down early one day when I was there. We had already started setting up our teen program for the day, our program director came to us and filled us in about the issue and how we were suppose to handle it and if necessary we would shut down early and have to send the kids home. The whole plumbing issue was that our toilets were becoming blocked up and could not flush properly. And since this problem is a health hazard our director did not want to take any chances on staying opened and having clients in the building.
So, when we got the news that we were in deed shutting down for the remainder of the day, we began to tell the kids so they can call their parents to be picked up and or find a ride home. When we told some of the kids they were confused as to why we had to close and they had to go home so soon, since they "just got here." Even when they called their parents to tell them the news their parents didn't understand as well as to why they had to come get their kids. Some parents told us to just leave their child at the center until they were able to get there because they did not have a ride or they wanted the child to stay and told us that "it's ok, they don't need to use the bathroom." I was shocked that some of these parents would say such things but then I put myself in there shoes and remembered the materials we read and realized this center is place that serves for the community truly and people depend on it really and truly. But it was also surprising that both the parents and the children did not really grasp the concept of public safety and health hazards. At the end of it, it took us about 45 minutes to contact the parents and set up rides for all of our teen clients and call all of the elementary clients parents to let them know they did not have to come.
The following week it was the same problem as plumbing problem again, but the only difference this week was that the plumber was there and he only needed about 30-45 more minutes to finish up the job. So, we took about eight kids to the Fry's electrons store that was around the block to use the restroom as a filler till our program started which would be the needed 30 minutes. By the time we returned the plumber was finished and we were back to business like nothing ever happened. The following two weeks our kids were on spring break so the youth program was closed for those two weeks. Since it was closed I was stuck doing odd jobs around the center that I was not used to. I was shredding papers from past clients, stuffing envelops with monthly news letters and new sign up information, also I was making phone calls to inform clients of their meetings they had scheduled or just to share the activities we were offering that we week that could benefit their personal needs.
No comments:
Post a Comment